Manhole Pipeline Installation

Due to the narrow space and insufficient land in the urban city, the construction method of telecommunication and transmission power line is changed from overhead to underground. For the example of power pipeline, it will be adopted the method of manhole or tunnel to connect the whole line system, then laying the power cable, performing test, and joining the system power supply.

Jenyi group is a specialized construction team with abundant construction experience and excellent quality. According to standard operation procedure (SOP) to perform the traffic maintain, safety & hygiene equipment, excavation, wale & brace, formwork, rebar, etc. Each project is in the best quality.

 
Jenyi completed the project of Chunghwa telecommunication pipeline and Taiwan transmission power cable pipeline under the excellent planning, quality management, sufficient equipment & machine in recent year. Jenyi also joined the bidding of the broadband duct construction project issued by the County Government.